News

HKS is now compatible with the excavator control systems from Leica and Topcon

excavator excavator control systems HKS Leica Topcon

HKS is now compatible with the excavator control systems from Leica and Topcon

HKS is now compatible with the excavator control systems from Leica and Topcon There is news from HKS in the field of 2D / 3D / GPS control for excavator control systems. The HKS sensor is now also compatible with the excavator control systems from the renowned manufacturer Topcon and with the additional GateWay Kit to Leica. (PresseBox) ( Wächtersbach , 07-21-16 ) In close cooperation with the two manufacturers, an interface concept was developed that converts the data from the HKS sensor accordingly and prepares it digitally for the control systems. These systems are currently also able to map...

Leer más →


New residential ensemble near the Rhine creates modern living space for Cologne

residential ensemble Rhine

New residential ensemble near the Rhine creates modern living space for Cologne

New residential ensemble near the Rhine creates modern living space for Cologne - Hitzler Ingenieure Düsseldorf is accompanying the construction project housing (PresseBox) ( Düsseldorf , 07-21-16 ) Hitzler Ingenieure also impresses with its project management services in the area of ​​residential construction: Industria Wohnen GmbH commissioned Hitzler Ingenieure with quality monitoring and construction controlling for their new residential complex on Bertoldistraße in Cologne-Mülheim on the right bank of the Rhine. After only two years of construction, the residential buildings at Bertoldistraße 17 and 13-15 with 77 and 76 apartments were handed over to Industria Wohnen. "Even before the building...

Leer más →


McShane Completes Construction of The Archer in Acworth, Georgia

Georgia McShane The Archer in Acworth

McShane Completes Construction of The Archer in Acworth, Georgia

McShane Completes Construction of The Archer in Acworth, Georgia The Archer is a 12-building, 315-unit garden-style apartment community in Acworth, Georgia. “Surrounded by lakes in the charming town of Acworth, The Archer offers the perfect mix of lake life and high-end living. Residents can enjoy all that the area has to offer, and then come home to an apartment with beautiful finishes and great amenities.” AUBURN, Ala. (PRWEB) July 08, 2021 McShane Construction Company has completed construction at The Archer in Acworth, Georgia. Built on behalf of repeat client RangeWater Real Estate, the new multi-family community incorporates 315 units. Located...

Leer más →


The multifunctional connecting piece of the LOGO range: the LOGO multi clamp

LOGO multi clamp LOGO range

The multifunctional connecting piece of the LOGO range: the LOGO multi clamp

The multifunctional connecting piece of the LOGO range: the LOGO multi clamp With the 0-20 cm adjustable LOGO multi clamp, PASCHAL has designed yet another versatile con-necting piece for the LOGO formwork range. (PresseBox) ( Steinach, 21-07-08 ) With the 0-10 cm LOGO multi clamp, PASCHAL offers a multifunctional connecting piece for length adjustments to the LOGO.3, LOGO.alu, LOGO.S and LOGO.pro formwork systems. The tried and tested LOGO multi clamp has now been expanded by a multi clamp with an extended variable range from 0-20 cm, which means that compensation panels up to 20 cm wide can now be connected,...

Leer más →


Implenia wins large tunnelling project in France: Lot 3 of the Lyon-Turin base tunnel

Implenia lyon tunel Turin

Implenia wins large tunnelling project in France: Lot 3 of the Lyon-Turin base tunnel

Implenia wins large tunnelling project in France: Lot 3 of the Lyon-Turin base tunnel TELT (Tunnel Euralpin Lyon Turin) awarded Lot 3 of the 57.5 km long Mont-Cenis base tunnel to a Joint Venture led by Implenia (34%). The total contract volume is CHF 248 million (EUR 228 million) and the project is in line with the company’s strategic focus on large, complex infrastructure projects. TELT (Tunnel Euralpin Lyon Turin), the Franco-Italian company responsible for the construction and management of the cross-border section of the new Lyon-Turin rail link, assigned Lot 3 of the 57.5 km long Mont-Cenis base tunnel...

Leer más →